SOUTH WALES CAVING CLUB ...... CLWB OGOFEYDD DEHEUDIR CYMRU EXPEDITION TO CANTABRIA, AUGUST 1998 INTERIM REPORT In August 1998, twelve members of the South Wales Caving Club spent two weeks in Ramales de la Victoria, Cantabria, northern Spain, to continue with cave exploration on the nearby area around Pico San Vicente. This project had been started on an expedition by the same club in summer 1997, and further work had been done by a small team at Easter 1998. This report will provide an outline of the work done by the 1998 expedition; a fuller report will appear in a forthcoming edition of the South Wales Caving Club's Newsletter. Background Before summer 1997, there was very little known cave of any significance on Pico San Vicente, despite its obvious potential and the presence of major cave systems under neighbouring hills. Following an initial reconnaissance and contact with the local caving club, Agrupacion Espeleologica Ramaliega, an SWCC expedition in July/August 1997 divided the hill into nine areas and began systematically searching each one for likely caves, using GPS (Global Positioning System) sets to record the position of each promising site. The establishment of a GPS base station at the campsite enabled a "differential GPS" system to be used, which significantly reduces the degree of error inherent in GPS data (caused by the deliberate scrambling of the information sent by satellites by the US authorities). Much of the terrain on the hill is rugged karst landscape, progress over it is slow and for this reason most of the work was concentrated in area "A", which was felt to have good potential. (Area A forms part of the Pena de Rozas, and includes the Pico de Hoyufresno, the highest point on the main ridge.) A total of 42 sites of speleological interest were logged, some of these were descended and showed that finding significant cave passage on San Vicente was a real possibility. A small team from SWCC visited the area again at Easter 1998 for one week, and although activities were hampered by poor weather they managed to descend some of the sites previously noted as well as walking on Hornijo and undertaking some sporting caving. The August 1998 Expedition The expedition took place from 31st July to 14th August 1998, and we were fortunate enough to be allowed to camp again at the public park Gandasson-Cubillas in Ramales de la Victoria. The South Wales Caving Club would like to place on record its thanks to Ayuntamiento de Ramales de la Victoria, and to the town's mayor, for their kindness in allowing us to use this site again. We would also like to thank Mr. Rafael Zorilla of nearby Riba, for his continued help, both with local liaison and for storing some of the team's equipment, and the Agrupacion Espeleologica Ramaliega for their continued support. A GPS base antenna was again established at the campsite, which has proved an invaluable asset to the exploratory work. A generator provided power for a computer to be run on-site, which allowed GPS data to be downloaded immediately and surveys to be plotted. Objectives The 1998 expedition set out with the following objectives: (i) to continue descending previously recorded sites of interest in San Vicente area "A", surveying each one as it was descended. (ii) to finish the surface sweep of area "A", recording sites with GPS as before. (iii) to continue the sweep of remaining areas of San Vicente. (iv) to search for possible resurgences in the river valleys to the north and east of San Vicente - the Ason and Gandara respectively - taking water temperature readings to try and establish the precise locations at which cave water from the mountain appears in the rivers. These objectives will now be dealt with in turn. (i) to continue descending previously recorded sites of interest in San Vicente area "A", surveying each one as it was descended. This objective occupied most of the manpower for most of the time, due largely to the fact that some significant cave systems were discovered, some of which took several days to rig, explore and survey. Members of the expedition tackled this work in groups of two or three, and soon realised that finding previously-recorded sites was seldom straightforward despite the red paint used to mark all the sites. The original plan - to work through the sites in numerical order - was soon abandoned in favour of descending sites as and when they were located, then comparing notes with other teams and returning to "tick off" any remaining sites at a later date. A spell of hot, sunny weather further complicated matters as although this meant that visibility was good, it made carrying ropes and equipment across the tough terrain hard work. While all of the sites previously found had been logged using the GPS equipment, in many cases the set had only been "on station" for a few minutes and for this reason most sites were re-logged to provide much greater accuracy. In some cases, the GPS sets were on station for several hours while the deeper shafts were explored. Bosch 24-volt cordless drills were used to facilitate the placing of bolts for descent, and all teams agreed that this approach was worthwhile, both in terms of time and effort saved and increased safety. Also, so-called "stud anchors" were used in place of the more usual "spits". These have several advantages; the hole can be drilled to any depth (as long as it exceeds the minimum necessary), does not need finishing "by hand" with a bolt driver, and after use the outstanding bolt can be hammered back flush with the rock face, leaving little visual evidence of the caver's presence. While this renders the bolt useless for further trips this is of no consequence in shafts that don't "go". The team's most significant finds were as follows: SVA 30 Surveyed depth: 191m This surface shaft in the upper amphitheatre was pushed by a team of three over several days. The immediate area around the red paint-marked "SVA 30" is peppered with shafts and after dropping stones down several of these the team opted for the one that sounded deepest. Initial exploration, in what was later named the "P.O.W. Series", indicated that the shaft bottomed out at around -65m but the team then found an alternative route which was pushed for several pitches to a slot at -80m, down which a good draught was blowing. The walls of some of these pitches were covered in a moonmilk-like substance, with which rope and equipment soon became caked, making exploration arduous. Beyond the slot, the passage became a huge rift which descended more or less vertically to the final limit at -191m. However, no evidence was noted of the draught at this point and the two members of the team who took part in the final push could not establish where it goes. This does leave something of a question mark over this part of the cave but the two cavers concerned searched the shaft extensively and could find no evidence of any other way on. However, one or two other possibilities remain to be investigated in the area around the slot, draughts enter the cave higher up and given the results in this cave the other surface shafts in the same immediate area deserve further, more thorough investigation. SVA 34 Surveyed depth: 126m Another shaft in the upper amphitheatre, this site had been considered one of the most exciting found during the surface sweep in 1997 due to the great distance down which dropped stones could be heard to fall. It was descended at the end of the 1997 trip and a blockage reached at around -50m. A team of three revisited the site on this year's trip and removed the blockage with a crowbar, encouraged by the presence of a cold draught. They continued exploring over several days, surveying as they went and eventually reached an impenetrable slot at -126m. It is worth noting that the slippery mud which made exploration difficult in SVA 30 was also present here. Two potential parallel shafts were later examined but both ended in tiny slots. This cave also had a good draught evident which could mean it is connected to a much larger system but the team concerned consider it unlikely that any further progress will be made at this site. SVA 16 Surveyed depth: 90m This is a big, obvious surface shaft on the NE rim of the upper amphitheatre which was descended on the first full day of the expedition. A descent of 20m was made to the gravel floor visible from the surface, from the far end of which a window up one wall was seen. (As an aside, it is worth pointing out that this window was not visible even the other end of the floor or from any point higher up, which indicates the need for thorough investigation of every site!) A slippery 3m climb gave access to this, from where dropped stones could be heard rattling for some distance, much to the excitement of those at the surface. The rope was rigged some 8m to a tight slot, from where a 20m near-vertical hang landed on a big gravel ledge above a wide, deep rift. At this point a halt was called, due to running out of rope, and a return made next day. Two cavers pushed the shaft while two others followed, surveying. The rift descended almost vertically for more than 40m to a gravel floor from which there was no way on. On the ascent some time and effort was spent investigating the possibility of a parallel shaft, to which it was considered access might be available from a large ledge of boulders. This proved inconclusive: while the caver stationed at the gravel floor thought that one or two of the stones dropped from above seemed to echo from "behind" the back wall, most landed at his feet. The tight slot below the "window" proved challenging for both descent and subsequent ascent, and cost one member of the team a carbide generator as he struggled to get back through it! SVA 33 Approximate surveyed depth: 50m Another shaft in the upper amphitheatre, this was initially descended for some 30m to a gravel floor. (The presence of a "spit", beside a ledge some 8m from the lip of the shaft, indicated that someone had previously examined this site.) Having ascertained that there was no way on from the bottom, a side route was examined which was found to connect to another nearby daylight shaft and this was bottomed at -50m. Despite the impressive scale of this shaft, no way on could be found. SVA 23 Approximate surveyed depth: 46m The most promising of the sites in the lower amphitheatre, this at first seemed to offer good potential but was found to end at -46m. SVA 29 Approximate surveyed depth: 40m This site in the lower amphitheatre was descended right at the end of the 1997 expedition, when a mud floor at -11m was reached from where a slot led into a long rift, down which stones echoed encouragingly. A lack of time and rope forced a withdrawal at this point but the two cavers concerned revisited the site on the first day of the 1998 expedition, descending the rift to a depth of -40m where a gravel floor offered no way on. Some time was spent on the ascent investigating a possible parallel shaft beyond a window but this proved to be just a short sloping rift that closed down. It is hoped that fuller descriptions of all of the caves explored, along with surveys and photographs will be published in the forthcoming SWCC Newsletter. (ii) to finish the surface sweep of area "A", recording sites with GPS as before. With most of the team occupied in descending and surveying shafts, nothing was done in pursuance of this objective until the last full day of the expedition, when a team of seven took two GPS sets onto the hill. A total of twenty-five sites were recorded and logged using the GPS; some of these sites consisted of several promising shafts in close proximity to each other and these were generally given a single "SVA" number. The area swept was that to the east of the two amphitheatres previously examined. It forms the eastern flank of the Hoyufresno massif, and includes the pass between this massif and the Muesca Chica to the east. Two large dolines were investigated (one of which forms, or is located within, the pass) both of which contained several very promising sites. Traversing the terrain here was considerably more difficult than that previously encountered, and for this reason while the upper doline was comprehensively surveyed, shortage of time meant that the lower was only cursorily examined and the eastern half of it hardly at all. It may be that some sites were missed as walking with the team in a line was impossible. Those present on the hill that day had no reference material to define the extent of Area A so it may be that we did not cover all of the terrain originally designated as Area A. All of those who took part in this exercise were convinced that the area covered offers great potential for finding cave and warrants further work. (iii) to sweep remaining areas of San Vicente. Little was done on this objective, although some sites previously recorded in area SVE were explored on the last day of the expedition. The sites noted in this area proved to be generally immature cave features, usually thin rifts which would require serious digging to produce any meaningful progress. One was found to consist of exceptionally rotten rock, several contained various animal skeletons (including a horse's skull!) but the final one dropped (SVE 3) was the best of the bunch. Some further progress may be expected at this site, but it is wet, muddy, very slippery and loose in places. It does, though, display some nice "flowmud". A hammer would be needed. (iv) to search for possible resurgences in the river valleys to the north and east of San Vicente, taking water temperature readings to try and establish the precise locations at which cave water from the mountain appears in the rivers. No work was done on this objective, although various members of the expedition made brief reconnaissances of the area previously identified as lying close to an underwater resurgence beside the Rio Gandara, where the AER are currently engaged in digging activities. Of the two rivers, the Gandara and Ason, the former seems most promising on the basis of current information. Other Activities Eight members of the expedition, including the two geologists present, took part in a walk from La Gandara to Riba, via the huge doline (1km across) of Hoyo Masallo. While a day's walk was only able to cover a small proportion of the Hornijo massif, the area has clear potential as evidenced by the numerous shakeholes adjacent to the path. (The team were also impressed at finding a hole emitting a cold draught, near Hoyo Salzoso, just yards from the main path!) The verdict of the geologists was that the areas of the mountain which consist of "reef" limestones were those most likely to repay serious investigation. It is clear that careful scrutiny of any area of Hornijo, and its subsequent speleological exploration, will occupy a great deal of time and manpower. As well as the exploratory work, some managed to find time for other caving activities. Several "tourist" trips visited Cueva Coventosa, and those seeing it for the first time were impressed with the scale and sporting nature of the cave. Sadly, a rope placed on the vertical drop close to the cave entrance was removed by persons unknown some time between 2nd August and 12th August. Three trips were made to Cueva Ca¤uela, with one party using large M22B flashbulbs to take photographs in the large entrance passage. However, the large passage at the end of the cave is not as easy to locate as the survey in Grandes Travesias would suggest and none of this summer's trips managed to find it. Conclusions Our initial investigations in 1997 led us to believe that significant cave passage exists under Pico San Vicente. This year's expedition has proved that belief to be justified, with several deep caves found along with evidence of good draughts, which would seem to indicate the presence of major cave passage beyond present limits. Of the terrain scrutinised so far, the upper amphitheatre in Area A would seem to offer the best hope of gaining access to a major cave system. In particular the site labelled SVA 30 and its associated shafts may warrant further investigation. In the light of this year's discoveries, the remainder of Area A needs to be explored with the same methodical approach and thoroughness used so far, as do the other areas of San Vicente. This work will no doubt occupy members of future expeditions for considerable lengths of time. The GPS equipment had already proved its usefulness in 1997 and this was underlined by the 1998 expedition. It is hoped that an accurate map of all the sites recorded will be available soon. The use of Bosch drills and stud anchors proved to be an extremely fast and safe means of descending previously unexplored shafts and we would wholeheartedly recommend that future expeditions adopt this approach. Future Work At the time of writing it is envisaged that SWCC members will make two visits to the area in 1999; a small team are planning a week's trip for Easter, while a (hopefully) larger group will travel out in the summer.  SVA1 (Brain's Folly) E = 459068 N = 4786879 A = ± 30m One of only two horizontal caves logged during the expedition. Short, to say the least and of no further practicable interest. Needs a better fix. Completed Summer 97. SVA2 E = 459072 N = 4787065 A = ± 5m 10 Metre shaft to boulder floor and impenetrable slot. Removal of boulder floor may reveal some way on but unlikely. Completed Summer 97. SVA3 E = 459139 N = 4787081 A = ± 5m 5 Metre tight shaft on N/W wall of doline. Joint Controlled. Completed April 98. SVA4 E = 459149 N = 4787082 A = ± 5m Three shafts all adjacent in the same doline. From East to West: - SVA4a, SVA4b, and SVA4c. SVA4a is a 7 Metre drop to a comfortable ledge, a stout thread rebelay drops a further 7 Metres to the floor. A to tight descending canyon could be opened out at floor level, but probably only leads into SVA4b. SVA4b A 10m greasy but otherwise pleasant shaft to a rebelay and further 10m VERY nice shaft lands on a descending boulder slope. An immediate sharp bend leads to muddy soakaway. Of little further interest. SVA4c is in the base of the doline and enters SVA4b part way down the first shaft. Completed Summer 97. SVA5 E = 459190 N = 4787073 A = ± 20m Shaft. Approximately 25 metres deep. Completed April 98. SVA6 E = 459208 N = 4787094 A = ± 5m Parallel narrow shafts (1m d), approximately 5 metres deep. Close to East Face of doline 3 of traverse. Completed April 98. SVA7 E = 459208 4787084 A = ± 5m Very narrow shaft ? 5 metres deep. South of and a little lower than SVA6. Completed April 98. SVA8 E = 459298 N = 4787099 A = ± 15m Very narrow shaft in jagged limestone. Formed along a joint, ? 15 metres deep. Completed April 98. SVA9 E = 459338 N = 4787098 A = +/- 15m Shaft formed on a North / South trending rift, 1 metre wide. Well Fluted. Completed April 98. SVA10 E = 459219 N = 4787131 A = +/-25m 10 to 12 metre shaft, blocked by boulders at -2 metres. Approx. 1.5m dia. Completed April 98. SVA11(Invisible Pot) E = 459222 N = 4787255 A = +/- 5m On the line of a major fault. An open hole (2m dia) in a grassy area on first level ground adjacent to large doline south of peak? Drops 3 or 4 metres to boulder floor, a low diggable bedding to a further drop of >10m. Needs a crowbar. Finished Summer 97 - Not Pushed. SVA12 E = 459289 N = 4787403 A = +/- 5m Upslope of major doline near peak? Joint controlled shaft 3m X 1m. 8m to boulders with a further tight drop of 2 m to choke. Completed Summer 97. SVA12a E = 459287 N = 4787396 A = +/- 5m Small hole down which stones drop for 8 to 10 metres. On same joint as SVA12. Would probably need some enlargement to enter. A lump hammer would prove useful. Completed April 98. SVA13 E = 459296 N = 4787410 A = +/- 5m In East / West aligned, joint controlled rift. A cross rift / shaft of about 10 metres depth. Bottom of shaft slopes steeply to the north to a choke. Possible dig. Completed April 98. SVA14 E = 459296 N = 4787416 A = +/- 5m In same rift as SVA13. Narrow slot between large collapsed slab. Initial drop of 5m + 5m to a further fall estimated as totalling 25m. Good echo, but to tight. To tight April 98. SVA15 E = 459442 N = 4787497 A = +/-50m On N/E rim of upper amphitheatre. Joint controlled solution rift. Goes nowhere, 14 metres deep. Completed Summer 98. SVA16 E = 459525 N = 4787473 A = +/-20m The 5 X 7m entrance drops a clear 30 odd metres in similar dimensions to a boulder strewn floor, visible from the surface. The continuation has been pushed to a conclusion, details to follow. Completed Summer 98. SVA17 E = 459361 N = 4786971 A = +/-15m 15 metre shaft. Blocked by boulders at the top. No previous entry. SVA18 E = 459389 N = 4786947 A = +/-20m Known site marked SV10 by AER. 2 - 3 m dia. Descending passage. 15 to 20 m long, with formations. Completed Summer 97. SVA19 E = 459512 N = 4787172 A = +/-25m Doline / Shaft. 20 x 10m wide. Choked at 15.5m. Completed Summer 98. SVA20 N = 459464 N = 4787125 A = +/-20m Shaft, 3m wide by 8m long. Drops 8m to blockage/ choke? SVA21 E = 459472 N = 4787165 A = +/- 15m Blocked shaft, 8mm deep. Short rift leads off, no way on. Completed Summer 98. SVA22 E = 459386 N = 4787202 A = +/-25m Rift / Shaft, 30m long by 2m wide. Choked at 16m depth. A possible dig. Completed Summer 98. SVA23 E = 459384 N = 4787215 A = +/- 15m Open shaft 8m deep. At -5m small window to tight spiky horizontal passage 2m long. Followed by 4m shaft of similar characteristics. Leads to top of 36 m pitch, well fluted attractive shaft ends in mud water and stones. Completed Summer 98. SVA24 E = 459415 N = 4787234 A = +/- 40m Series of 3 Rifts / Shafts, all about 10m deep, by 1.5m wide. Main shaft descended to choke at -14m, 10/09/98. Completed Summer 98. SVA25 E = 459354 N = 4787171 A = +/-20m Two 8m deep, open rift systems, with no way on. Completed Summer 98. SVA26 E = 459322 N = 4787015 A = +/- 15m Large 15m joint controlled shaft. Choked at the bottom. Completed Summer 98. SVA27 E = 459345 N = 4787159 A = +/- 5m Shaft in floor of large shakehole. 2.5m X 5m. 7 m deep. Smaller subsidiary shafts enter from rim of shakehole. Another adjacent 10m shaft may be independent of main shaft but needs boulder moving. SVA28 E = 459515 N = 4787059 A = +/- 15m 1m square shaft to boulder blockage at -5m. Stones fall past to approx. 20m. SVA29 E = 459577 N = 4787066 A = +/-40m 0.5 X 2m shaft. 8m drop to blockage or slope to a further fall of 20/25m. Completed Summer 98. SVA30 E = 459374 N = 4787449 A = +/-20m Major find of the expedition. Descends to nearly -200m. Ends in hopelessly choked shaft. Other shafts adjacent to main shaft may repay some attention. SVA31 E = 459424 N = 4787420 A = +/- 10m Shaft, 4m square section, 15m deep with no way on. Completed Summer 98. SVA32 E = 459376 N = 4787218 A = +/-25m Shaft, 0.5m X 2m section, 18m deep. No way on. Completed Summer 98. SVA33 E = 459434 N = 4787386 A = +/-20m Shaft near SVA31. Descends to 50m. No way on. Completed Summer 98. SVA34 E = 459457 N = 4787306 A = +/-30m Another major find. Descends to over 100m. Pushed to a miniscule (75mm) conclusion, details to follow. Completed Summer 98. SVA35 E = 459542 N = 4787361 A = +/-20m A shaft of 3m square section, 24m deep. A rift development near the bottom leads nowhere. Completed Summer 98. SVA36 E = 459493 N = 4787447 A = +/- 15m Short (7m) shaft, 2m X 6m section, with rift passage leading off to the south. SVA37 E = 459454 N = 4787273 A = +/-20m Rift, 20m deep. Would be lowest point of doline. SVA38 E = 459440 N = 4787449 A = +/-20m Doline / Rift. Investigated, but no way on found. Completed Summer 98. SVA39 E = 459403 N = 4787492 A = +/- 15m 8m Shaft to mud floor. Small half meter drop in side passage, too small to enter. Completed Summer 98. SVA40 E = 459428 N = 4787136 A = , +/-30m 3m dia. shaft formed on a joint/ fault. 15m deep, possibly deeper through adjacent boulders. SVA41 E = 459412 N = 4787451 A = +/- 5.5m shaft to ledge and further shaft of 11m to a boulder floor. No way on. Completed Summer 98. SVA42 E = 459384 N = 4787208 A = +/- Short shaft (5m) to impenetrable slot. Near to SVA23. Completed Summer 97. SVA43 E = N = A= +/- 18m blind shaft. Completed Summer 98. SVA44 E = N = A= +/- 5m shaft to floor. removal of large boulder gained further shaft of 10m to mud floor with no way on. Completed Summer 98. SVA45 E = N = A= +/- 34m blind shaft. Completed Summer 98. SVA46 E = N = A= +/- Inadvertently marked SVA15. Goes nowhere. details to follow. Completed Summer 98. SVA47 E = N = A= +/- Un-used point. SVA48 E = N = A= +/- Un-used point. SVA49 E = N = A= +/- Un-used point. SVA50 E = 459783 N = 4787001 A= +/- Sizeable shaft, approximately 30m deep. SVA51 E = 459588 E = 4787365 A= +/- Narrow rift/shaft close to dividing line between dolines. Approximately 30m deep. SVA52 E= 459613 N= 4787331 A= +/- Shaft/rift in two separate sections slightly upslope from SVA51. SVA53 E= 459760 N= 4787458 A= +/- Series of shafts. SVA54 E= 459760 N= 4787458 A= +/- Shaft close to SVA53. SVA55 E= 459767 N= 4787451 A= +/- Shaft. SVA56 E= 459767 N= 4787451 A= +/- 20 - 30m shaft. SVA57 E= 459770 N= 4787400 A= +/- 10m Shaft with tree. SVA58 E= 459770 N= 4787390 A= +/- Big open shaft with trees growing in it. SVA59 E= 459780 N= 4787400 A= +/- 30m Shaft. SVA60 E= 459711 N= 4787455 A= +/- Shaft. SVA61 E= 459711 N= 4787460 A= +/- Shaft. SVA62 E= 459729 N= 4787434 A= +/- Shaft. SVA63 E= 459787 E= 4787496 A= +/- Shaft. SVA64 E= 459779 N= 4787496 A= +/- Shaft. SVA65 E= 459774 N= 4787506 A= +/- Shaft. SVA66 E= 459750 N= 4787349 A= +/- Large cave entrance in shakehole with huge tree growing in it. Descending rift, 2 - 3m wide 4m high at lip. SVA67 E= 459787 N= 4787311 A= +/- Large tree filled hole. 20/30m deep. SVA68 E= 459771 N= 4787268 A= +/- Rift with trees, towards SW corner of lower east doline. SVA69 E= 459787 N= 4787261 A= +/- Deep hole? with tree. 20 m from SVA71. SVA70 E= 459771 N= 4787298 A= +/- Narrow shaft, bells out below. Approximately 20m deep. SVA71 E= 459806 N= 4787282 A= +/- Shaft 30m to 40m. Tree lined. SVE1 E= 459923 N=4786812 A= +/- Joint controlled shaft. Approximately 20m deep, on eastern side of washed out depression. SVE2 E=459937 N=4786812 A= +/- Narrow joint controlled slot, 7m east of SVE1. Formed in rotten limestone. Easy climb down (9m) to floor of rocks. 5m passage contains dead goat. no way on. Completed Summer 98. SVE3 E = 459965 N = 4786816 A= +/- Free climb - pitch (3 - 4m) in rift to floor. Then down smooth calcited rock (3m) to descending passage. Down slope ends in constriction, but seen to continue beyond. Worth digging. SVE4 E = 459691 N = 4786813 A= +/- Rift - shaft across the strike. Drops to a possible dig. SVE5 E = 459873 N = 4786837 A= +/- A possible dig site. SVE6 E = 459873 N = 4786837 A= +/- Rift angled across dip - strike. Well worth digging. SVE7 E = 459740 N = 4786858 A= +/- Rift across strike. 3 or 4m deep. Needs clearing of brambles. SVE8 E = 459852 N = 4786914 A= +/- Large depression. Possible dig.